"I cannot thank you enough for your service. It is a rare thing to find a firm these days that deal with people in a polite and efficient way."
Showing posts with label Spider Lift Hire. Show all posts
Showing posts with label Spider Lift Hire. Show all posts

Wednesday, 1 April 2015

Tree removal on the highway

Removal of a dangerous tree leaning into the highway on the A44 Worcester to Bromyard Road.


Other works included reduction in height of poplar trees and removal of dead wood from established oaks.


For more information on our high access tree services please visit http://www.overheadworks.co.uk/Equipment_Hire.aspx

Friday, 23 January 2015

Felling a Monterey cypress tree

Working with Adrian Hope Tree Services this 27 metre Monterey cypress tree which had a dangerous split in the middle was safely felled in Colwall, Malvern.

The tree could not be climbed due to a large split in the middle of the trunk

Firstly the brash was removed then the limbs and trunk sectioned and roped down.
For more information on our high access tree services please visit http://www.overheadworks.co.uk/Equipment_Hire.aspx

Thursday, 11 December 2014

Solar panel maintenance

K-lec Electrical Consultants hired in our up and over powered access with operator to fit a lighting conductor to the existing uv solar panels on Fortis Living head office.
All work carried out safely from the machine basket. No need for scaffold.
For more information on our high access maintenance services please visit http://www.overheadworks.co.uk/Maintenance.aspx

Monday, 20 October 2014

Overhead works at Kingsholm Stadium

High level lighting maintenance and signage replacement at Gloucester Rugby club.

For more information on our high access maintenance services please visit http://www.overheadworks.co.uk/Maintenance.aspx

Saturday, 23 August 2014

Farm Building Roof Maintenance

Upper Grange Farm in Bacton, Herefordshire required roof clearance, roof fabric repairs, and removal of overhanging branches from a nearby Horse Chestnut tree.


 For more information on overhead cleaning works please visit http://www.overheadworks.co.uk/Cleaning.aspx

Sunday, 4 August 2013

Machine Access Options

Narrow track settings, detachable baskets, and adjustable fly jibs give us good options for machine access.



 

Coventry University High Access Window Cleaning

During July window cleaning has taken place on selected buildings with in the city campus.

High Access Window Cleaning
Heated ultra pure water was transported to site and used for the cleaning process.  
The water is rain harvested from roofs and purified to a high standard at our depot in Worcester.

High Access Window Cleaning

Traffic management was arranged for working on the highways.

Tuesday, 21 May 2013

Factory Cladding Clean

Fletcher Access combine long reach platforms with heated ultra pure water to provide excellent cleaning results at this packaging manufacturer in Malvern. 

Tuesday, 23 April 2013

High level factory dust control

Automated Packaging Systems supply a range of standard and custom polythene bags in multiple materials.
Fletcher Access carry out periodic high level vacuuming ensuring that dust levels are kept to a minimum during the manufacturing process. 

Our 19 meter platform runs off mains electric with a integral power feed to basket for the 110v vacuum.

Tuesday, 9 April 2013

NEW College

Situated in Redditch and Bromsgrove. North East Worcestershire College provides the community with a spectacular range of facilities for the Further, Higher and Adult Education.


Fletcher Access service the college with overheadworks that include glass and canopy cleaning, lighting and gutter maintenance.



Sunday, 24 March 2013

High Access CCTV Maintenance

Fletcher Access have worked with Worcester County Council to service its high level CCTV cameras at park and ride sites around the City.


Fletcher Access can assist with:-
  • Highways planning and traffic management
  • Ground protection boards
  • Site to site transport


High Access Chimney Maintenance Works

Safe access for chimney repointing, cowl and lining installations.


Ground protection boards ensure no damage to lawn and paved areas.

Saturday, 9 February 2013

The Princess Royal visits Coventry University

THE Princess Royal gave her royal seal of approval to a multi-million department at Coventry University.

Princess Anne officially opened the £55 million faculty of engineering and computing and was given a tour of the building.

Fletcher Access provided pre visit cleaning works to glass and cladding using a 27 meter crawler mounted work platform.