"I cannot thank you enough for your service. It is a rare thing to find a firm these days that deal with people in a polite and efficient way."
Showing posts with label High Level Cleaning. Show all posts
Showing posts with label High Level Cleaning. Show all posts

Friday, 9 May 2014

Severn Waste Recycling Depot

The EnviroSort plant receives, sorts and despatches all the clean recyclables collected from households across Worcestershire and Herefordshire


Fletcher Access carry out period maintenance to the light fittings in the 7,000 sq.m. building.

For more information on our high access maintenance services please visit
http://www.overheadworks.co.uk/Maintenance.aspx

Sunday, 24 November 2013

Hereford Furniture


Hereford Furniture are British manufacturers of quality furniture collections, supplying painted furniture, oak furniture and pine furniture to retailers nationwide.



Fletcher Access were brought in to clean the cladding and signage of the factory and warehouses in Hereford as part of the recommendations made by Lord Digby Jones in a BBC2 3 – part series looking at the state of the British manufacturing industry.

For more information on overhead cleaning works please visit http://www.overheadworks.co.uk/Cleaning.aspx

Sunday, 4 August 2013

Machine Access Options

Narrow track settings, detachable baskets, and adjustable fly jibs give us good options for machine access.



 

Coventry University High Access Window Cleaning

During July window cleaning has taken place on selected buildings with in the city campus.

High Access Window Cleaning
Heated ultra pure water was transported to site and used for the cleaning process.  
The water is rain harvested from roofs and purified to a high standard at our depot in Worcester.

High Access Window Cleaning

Traffic management was arranged for working on the highways.

Tuesday, 21 May 2013

Factory Cladding Clean

Fletcher Access combine long reach platforms with heated ultra pure water to provide excellent cleaning results at this packaging manufacturer in Malvern. 

Tuesday, 23 April 2013

High level factory dust control

Automated Packaging Systems supply a range of standard and custom polythene bags in multiple materials.
Fletcher Access carry out periodic high level vacuuming ensuring that dust levels are kept to a minimum during the manufacturing process. 

Our 19 meter platform runs off mains electric with a integral power feed to basket for the 110v vacuum.

Tuesday, 9 April 2013

NEW College

Situated in Redditch and Bromsgrove. North East Worcestershire College provides the community with a spectacular range of facilities for the Further, Higher and Adult Education.


Fletcher Access service the college with overheadworks that include glass and canopy cleaning, lighting and gutter maintenance.



Saturday, 9 February 2013

The Princess Royal visits Coventry University

THE Princess Royal gave her royal seal of approval to a multi-million department at Coventry University.

Princess Anne officially opened the £55 million faculty of engineering and computing and was given a tour of the building.

Fletcher Access provided pre visit cleaning works to glass and cladding using a 27 meter crawler mounted work platform.