"I cannot thank you enough for your service. It is a rare thing to find a firm these days that deal with people in a polite and efficient way."
Showing posts with label High Access Cleaning. Show all posts
Showing posts with label High Access Cleaning. Show all posts

Saturday, 23 August 2014

Farm Building Roof Maintenance

Upper Grange Farm in Bacton, Herefordshire required roof clearance, roof fabric repairs, and removal of overhanging branches from a nearby Horse Chestnut tree.


 For more information on overhead cleaning works please visit http://www.overheadworks.co.uk/Cleaning.aspx

Sunday, 4 August 2013

Coventry University High Access Window Cleaning

During July window cleaning has taken place on selected buildings with in the city campus.

High Access Window Cleaning
Heated ultra pure water was transported to site and used for the cleaning process.  
The water is rain harvested from roofs and purified to a high standard at our depot in Worcester.

High Access Window Cleaning

Traffic management was arranged for working on the highways.

Tuesday, 21 May 2013

Factory Cladding Clean

Fletcher Access combine long reach platforms with heated ultra pure water to provide excellent cleaning results at this packaging manufacturer in Malvern. 

Tuesday, 23 April 2013

High level factory dust control

Automated Packaging Systems supply a range of standard and custom polythene bags in multiple materials.
Fletcher Access carry out periodic high level vacuuming ensuring that dust levels are kept to a minimum during the manufacturing process. 

Our 19 meter platform runs off mains electric with a integral power feed to basket for the 110v vacuum.

Tuesday, 9 April 2013

NEW College

Situated in Redditch and Bromsgrove. North East Worcestershire College provides the community with a spectacular range of facilities for the Further, Higher and Adult Education.


Fletcher Access service the college with overheadworks that include glass and canopy cleaning, lighting and gutter maintenance.



Saturday, 9 February 2013

The Princess Royal visits Coventry University

THE Princess Royal gave her royal seal of approval to a multi-million department at Coventry University.

Princess Anne officially opened the £55 million faculty of engineering and computing and was given a tour of the building.

Fletcher Access provided pre visit cleaning works to glass and cladding using a 27 meter crawler mounted work platform.

Thursday, 10 January 2013

Wychavon Civic Centre

Fletcher Access have been awarded the work of cleaning the Wychavon Civic Centre roof glass and windows. Shown in the photograph is the conservatory which seats up to 35 persons and is used for exhibitions, luncheons and wedding ceremonies.


Wednesday, 2 January 2013

Coventry University Multi-storey Car park

Set over 15 half levels and wrapped in an elegant screen of vertical stainless steel panels. Fletcher Access were contracted in the December shut down for cleaning works which included the external cladding and internal steam cleaning of the balustrade and handrail iron work.