Showing posts with label High Access Cleaning. Show all posts
Showing posts with label High Access Cleaning. Show all posts
Saturday, 23 August 2014
Farm Building Roof Maintenance
Upper Grange Farm in Bacton, Herefordshire required roof clearance, roof fabric repairs, and removal of overhanging branches from a nearby Horse Chestnut tree.
For more information on overhead cleaning works please visit http://www.overheadworks.co.uk/Cleaning.aspx
Sunday, 4 August 2013
Coventry University High Access Window Cleaning
During July window cleaning has taken place on selected buildings with in the city campus.
Heated ultra pure water was transported to site and used for the cleaning process.
The water is rain harvested from roofs and purified to a high standard at our depot in Worcester.
Traffic management was arranged for working on the highways.
Tuesday, 21 May 2013
Factory Cladding Clean
Fletcher Access combine long reach platforms with heated ultra pure water to provide excellent cleaning results at this packaging manufacturer in Malvern.
Tuesday, 23 April 2013
High level factory dust control
Automated Packaging Systems supply a range of standard and custom polythene bags in multiple materials.
Fletcher Access carry out periodic high level vacuuming ensuring that dust levels are kept to a minimum during the manufacturing process.
Our 19 meter platform runs off mains electric with a integral power feed to basket for the 110v vacuum.
Tuesday, 9 April 2013
NEW College
Situated in Redditch and Bromsgrove. North East Worcestershire College provides the community with a spectacular range of facilities for the Further, Higher and Adult Education.
Fletcher Access service the college with overheadworks that include glass and canopy cleaning, lighting and gutter maintenance.
Fletcher Access service the college with overheadworks that include glass and canopy cleaning, lighting and gutter maintenance.
Saturday, 9 February 2013
The Princess Royal visits Coventry University
THE Princess Royal gave her royal seal of approval to a multi-million department at Coventry University.
Princess Anne officially opened the £55 million faculty of engineering and computing and was given a tour of the building.
Fletcher Access provided pre visit cleaning works to glass and cladding using a 27 meter crawler mounted work platform.
Princess Anne officially opened the £55 million faculty of engineering and computing and was given a tour of the building.
Fletcher Access provided pre visit cleaning works to glass and cladding using a 27 meter crawler mounted work platform.
Thursday, 10 January 2013
Wychavon Civic Centre
Wednesday, 2 January 2013
Coventry University Multi-storey Car park
Subscribe to:
Comments (Atom)








