Morgan Technical Ceramics

Gulley clearance works at Morgan using a safety line and fall arrest block

Operatives accessed each gulley via the MEWP. A temporary safety line was attached to the base of the MEWP and ran along the gulley. Operatives remained inside the gulley and clipped onto the line using a safety harness and running fall arrest block. In the event of a fall the block will engage the line and act as a fall arrest. A scissor lift was stationed inside the factory to facilitate an emergency rescue if required.

Other works included felling of seven trees around the factory lagoon and prunning of two trees encroaching on buildings.