"I cannot thank you enough for your service. It is a rare thing to find a firm these days that deal with people in a polite and efficient way."

Tuesday 6 November 2012

The Hopmarket Worcester

Formely known as the Hop Market Hotel the building dates back to the start of the 20th century, and is now a mix of shops and residential dwellings. Over head works to date include window cleaning, gutter clearance and provision of powered access for structual surveying. A road closure is arranged with the local highways. All traffic management and planning is included as part of our high access services.


Saturday 3 November 2012

Morgan Technical Ceramics

Gulley clearance works at Morgan using a safety line and fall arrest block

Operatives accessed each gulley via the MEWP. A temporary safety line was attached to the base of the MEWP and ran along the gulley. Operatives remained inside the gulley and clipped onto the line using a safety harness and running fall arrest block. In the event of a fall the block will engage the line and act as a fall arrest. A scissor lift was stationed inside the factory to facilitate an emergency rescue if required.

Other works included felling of seven trees around the factory lagoon and prunning of two trees encroaching on buildings.