High rise tower block window cleaning


The St John’s tower blocks in Worcester are managed by Fortis Living and our work involved window cleaning to the communal staircases. The cleaning process included the use of rain harvested purified water to enable a thorough cleaning of both frames and glass

View from the top at 37 meters
High rise window cleaning using a 37 meter crawler mounted platform
Purified water was used for a thorough clean of glass and frames
 
For more information on overhead cleaning works please visit http://www.overheadworks.co.uk/Cleaning.aspx

New signage fitted at Kingsholm Stadium

Gloucester Rugby club contacted us to fit new signage for the start of the new season.
Fitting signage working from the pitch
Note ground protection used - three days before start of the new season

 For more information on our high access maintenance services please visit http://www.overheadworks.co.uk/Maintenance.aspx

Lift and fit work using machine winch

An industrial roof cowl was safely lifted and fitted into place using our custom built winch attachment at Envirosort in Worcestershire.

Industrial Roof Cowl mid lift
Industrial Roof Cowl lift


  















Gently placed on the roof next to man safe provision
Fitted working from the roof man safe provision
For more information on our high access maintenance services please visit http://www.overheadworks.co.uk/Maintenance.aspx

Monday, 23 May 2016

Rain harvested purified water for sale


Ultra pure water is collected and used by local window cleaners and aquarium owners all over Worcestershire. 
  •  18 Meg ultra pure 0 parts per billion
  •  Rain water harvested
  •   UV filtered
  •  Simple collect and load arrangement 24/7
  • Supplied hot or cold

Contact Simon on 07899 792183


Friday, 29 April 2016

Difficult access tree work

This tree line making up part of the properties boundary could not be climbed
Trees were trimmed back to prevent fouling of the roof






















Reaching across and working back from the other side
For more information on our high access tree services please visit http://www.overheadworks.co.uk/Tree_Works.aspx

Friday, 22 April 2016

Internal Partition Construction

A partition erected inside a workshop at Hill and Moor waste site to help with dust control.
Sheets were lifted to height and clamped to the steel framework of the building.
For more information on our high access maintenance services please visit http://www.overheadworks.co.uk/Maintenance.aspx

Friday, 15 April 2016

Fast and efficient roof repairs

Roof repairs without the need for scaffold. Contact Simon on 07899792183