"I cannot thank you enough for your service. It is a rare thing to find a firm these days that deal with people in a polite and efficient way."

Wednesday, 31 December 2014

Coventry University's Faculty of Engineering and Computing

The Engineering and Computing building is a business-focussed education and research facility.
The building includes extensive workshops, a wind tunnel testing facility, lecture theatres, communal interactive spaces, teaching spaces, academic offices, and a roof top experiment area.
Fletcher Access undertake periodic high level cleaning of the glass and cladding using heated purified water and bi-energy emission-free tracked powered access.

For more information on overhead cleaning works please visit http://www.overheadworks.co.uk/Cleaning.aspx

Saturday, 20 December 2014

Viaduct Maintenance

Severn Valley Railway north viaduct in Bewdley was cleared of vegetation growth and sections of sandstone surveyed for future maintenance work. 
The overhead work involved a lane closure with traffic management and assistance from SVR volunteers.
Working inside the lane closure the long reach tracked machine was used to gain access over the rooftops of properties on the left of the picture.

For more information on our high access maintenance services please visit http://www.overheadworks.co.uk/Maintenance.aspx

Thursday, 11 December 2014

Solar panel maintenance

K-lec Electrical Consultants hired in our up and over powered access with operator to fit a lighting conductor to the existing uv solar panels on Fortis Living head office.
All work carried out safely from the machine basket. No need for scaffold.
For more information on our high access maintenance services please visit http://www.overheadworks.co.uk/Maintenance.aspx