"I cannot thank you enough for your service. It is a rare thing to find a firm these days that deal with people in a polite and efficient way."

Wednesday, 21 March 2018

Stone and masonry inspection

Working with Nick Joyce Architect's, we have assisted with a high level stone and masonry inspection at Kinlet Hall in Shropshire.
High level stone and masonry inspection at Kinlet Hall in Shropshire
Omme 2750 Up and over reach

For more information on our high access maintenance services please visit http://www.overheadworks.co.uk/Maintenance.aspx

Difficult access roof repairs

Saving on the cost of scaffold, these pictures show some recent difficult access roof repairs using our tracked powered access.
Replacement of wind blown guttering on a clock tower in Nottingham
Hip Tile Replacement NHS Accomodation, Worcester
New roof gas flue installation The Hopmarket, Worcester
Rainwater goods repair St Oswalds, Gloucester
For more information on our high access maintenance services please visit http://www.overheadworks.co.uk/Maintenance.aspx

Poplar Tree Dismantle

Working with David Edwards Tree Services these 35 meter poplar trees were dismantled at Downton near Ludlow.
Using our 42 meter platform to dismantle 35 meter poplar trees

Ready for felling

For more information on our high access tree services please visit http://www.overheadworks.co.uk/Tree_Works.aspx

Tuesday, 27 June 2017

Working heights to 42 meters

A new ommelift 4200 takes our overheadworks up to 42 meters.
Put straight to work on tower block window cleaning for Fortis Living Group.
Hydraulic hose to basket allows safe high level pressure washing.
The crawler chassis deals with all types of terrain.

Powered by a hybrid diesel/batteries engine for reduced noise and air pollution.

For more information please contact Simon on M07899792183.


Friday, 16 June 2017

Envirecover Waste Plant

External window cleaning was part of the final preparations for the official opening of the new incinerator plant at Hartlebury Trading Estate, Kidderminster.
The EnviRecover plant will transform 200,000 tonnes of non-recyclable waste into electricity each year - enough to power 32,000 homes.

Tuesday, 7 February 2017

Roof and tree works at Hagley Hall

Hagley Hall is the home of 12th Viscount Cobham with part of the house available for both private and corporate functions.

Our work included roof repairs to the random slate on the house corner towers and a height reduction of the beech trees on the front lawn.

Reduction in height to trees on the main lawn
Ground protection boards in use
For more information on our high access maintenance services please visit http://www.overheadworks.co.uk/Maintenance.aspx

Tuesday, 27 September 2016

High rise tower block window cleaning


The St John’s tower blocks in Worcester are managed by Fortis Living and our work involved window cleaning to the communal staircases. The cleaning process included the use of rain harvested purified water to enable a thorough cleaning of both frames and glass

View from the top at 37 meters
High rise window cleaning using a 37 meter crawler mounted platform
Purified water was used for a thorough clean of glass and frames
 
For more information on overhead cleaning works please visit http://www.overheadworks.co.uk/Cleaning.aspx